The Fiscal Year (FY) 2015-2018 Transportation Improvement Program (TIP) is a four-year program for the implementation of surface transportation projects within the Hampton Roads Metropolitan Planning Area (MPA). The TIP contains all federally-funded projects and/or regionally significant projects that require an action by the Federal Highway Administration (FHWA) or Federal Transit Administration (FTA). Before any federally-funded and/or regionally significant surface transportation project can be built in the Hampton Roads MPA, it must be included in the current TIP that has been approved by the HRTPO.
The following table lists existing Active Transportation projects that are included in the TIP. This list is meant for informational purposes and may not include every Active Transportation project.
UPC |
Project Name |
Jurisdiction |
Description |
18591 |
Portsmouth Boulevard Widening |
Chesapeake |
Widen Portsmouth Blvd to 4 lanes from the City of Suffolk line to Joliff Rd |
63564 |
Great Bridge Battlefield Enhancements |
Chesapeake |
Great Bridge Battlefield and waterway visitor center and trail |
77403 |
Dismal Swamp Canal Multi-Use Trail |
Chesapeake |
Construct the Dismal Swamp Canal Trail on abandoned Rte 17 right of way |
93203 |
Dismal Swamp Canal Multi-Use Trail - ARRA |
Chesapeake |
Construction of the Dismal Swamp Canal Trail |
100538 |
Chesapeake Intelligent Transportation Systems Improvements |
Chesapeake |
Installation of CCTV, variable message signs, highway advisory radio systems, and automated traffic count collection devices |
104392 |
ARRA- Dismal Swamp Canal Trail |
Chesapeake |
Construct Dismal Swamp Canal Trail |
98806 |
George Washington Memorial Highway Signal Timing Improvements |
Gloucester County |
Signal coordination along George Washington Memorial Hwy from the Coleman Bridge to the Gloucester Court House area |
100625 |
Guinea Road and Hayes Road Bicycle and Pedestrian Improvements |
Gloucester County |
Retrofit Guinea Rd (Rte 216) from George Washington Memorial Hwy (Rte 17) to Maryus Rd and Hayes Rd (Rte 1216) from Rte 17 to the intersection of Rte 17 and Hook Rd to allow safe use of non-motorized forms of transportation |
100626 |
George Washington Memorial Highway Bicycle and Pedestrian Improvements |
Gloucester County |
Retrofit bicycle-pedestrian improvements into the George Washington Memorial Hwy Widening project from the Coleman Bridge to Farmwood Rd |
101793 |
Isle of Wight Multi-Use Trail - Segment 1 |
Isle of Wight County |
Construct a pedestrian and bicycle trail along Battery Park Road from Nike Park Road to South Church St. in the Town of Smithfield. |
101794 |
Isle of Wight Multi-Use Trail - Segment 2 |
Isle of Wight County |
Construct a pedestrian and bicycle trail along Nike Park Road from Battery Park Rd to the Carrolton Nike Park. |
91219 |
Isle of Wight Multi-Use Trail |
Isle of Wight County |
Construct multi-use trail from the Cypress Creek Bridge to Nike Park, following South Church St, Battery Park Rd, and Nike Park Rd |
100541 |
Courthouse Highway and North Court Street Pedestrian Improvements |
Isle of Wight County |
Construct a sidewalk from the intersection of Courthouse Hwy and Five Forks Rd (Rte 606) to 550' south of Joyner Town Ln on N Court St |
102951 |
Main Street Pedestrian Improvements |
Isle of Wight County |
Construct sidewalks to connect existing sidewalks in Smithfield to the Park and Ride Lot at the intersection of Main St and Route 10 |
17633 |
Richmond Road Multi-Use Trail |
James City County |
Construct a multi-use trail from the Norge Library on Croaker Rd to the intersection of Richmond Rd and Old Church Rd, following Croaker Rd and Richmond Rd |
50057 |
Ironbound Road Reconstruction |
James City County |
Reconstruct roadway and widen to 4 lanes from Strawberry Plains Rd (Rte 616) to DePue Dr (Rte 615) |
102980 |
Pocahontas Trail Multimodal Corridor |
James City County |
Upgrade Pocahontas Trail to include 5 ft sidewalk, 5 ft paved shoulder, pedestrian lighting, and bus pull offs. |
11816 |
City Center Boulevard (formerly Middle Ground Boulevard) Extension |
Newport News |
Construct 4 lane extension of Middle Ground Blvd from Jefferson Ave (Rte 143) to Warwick Blvd (Rte 60) |
13478 |
J. Clyde Morris Boulevard Bicycle Improvements - Phase II |
Newport News |
Construct a bikeway from Jefferson Ave to the Mariners Museum |
14598 |
Warwick Boulevard Relocation |
Newport News |
Relocate Warwick Blvd west of current alignment from Ft. Eustis Blvd (Rte 105) to east end of Skiffes Creek Bridge |
16103 |
Oyster Point Bikeway/Sidewalk Phase IV |
Newport News |
Construct a bikeway/sidewalk along Oyster Point Road from Jefferson Ave to Village Green Parkway. |
83252 |
Jefferson Avenue Pedestrian Improvements |
Newport News |
Widen sidewalks to a minimum of 8 feet on both sides of Jefferson Avenue from J Clyde Morris Blvd (Rte 17) to Buchanan Dr |
83254 |
Mariner's Museum Multi-Use Trail |
Newport News |
Construct multi-use trail to connect existing and planned sidewalks along Warwick Blvd, from Avenue of the Arts to 350' north of Harpersville Rd |
83435 |
J. Clyde Morris Boulevard Bicycle Improvements - Phase V |
Newport News |
Construct bicycle path on J. Clyde Morris Blvd from Jefferson Ave (Rte 143) to Thimble Shoals Blvd |
83437 |
Warwick Boulevard Pedestrian Improvements |
Newport News |
Widen the sidewalk along Warwick Blvd from Avenue of the Arts (Rte 312) to Lucas Creek |
98566 |
Intersection Improvements at Jefferson Ave. and Brick Kiln Boulevard |
Newport News |
Increase turn length, upgrade signal hardware, add pedestrian phase and ramps at intersection of Jefferson Ave. and Brick Kiln Boulevard. |
98567 |
Pedestrian Improvements from Jefferson Ave. to Habersham Drive |
Newport News |
Upgrade signal hardware, add pedestrian phase and ramps, and remove fixed objects at intersection |
98568 |
Pedestrian Improvements from Jefferson Ave. to Boykin Lane |
Newport News |
Install high visibility crosswalk and curb ramps at intersection of Boykin Lane |
98569 |
Pedestrian Improvements from Warwick Blvd. to Colony Road |
Newport News |
Upgrade signal hardware, add pedestrian phase and crosswalks and add channelized islands |
100856 |
Oakland Industrial Park Sidewalk Phase 2 |
Newport News |
Construct sidewalks along Harwood Drive from Enterprise Drive to Enterprise Drive; and on Pickett's Line, from Enterprise Drive to Warwick Boulevard. |
103059 |
Newport News Pedestrian Improvements |
Newport News |
Improve pedestrian accomodations at 60 signalized intersections. |
14672 |
Hampton Boulevard Reconstruction |
Norfolk |
Reconstruct Hampton Blvd from Rogers Ave to B Ave |
97727 |
Elizabeth River Trail Phase 3a |
Norfolk |
Construction of a 10-ft wide multi-use trail from Redgate Ave/Weyanoke St to Armistead Bridge Road, Connecting phases 2b and 3b of Elizabeth River Trail. |
103075 |
Elizabeth River Trail, Phase 4B |
Norfolk |
Construct a bicycle and pedestrian trail from Norfolk Southern Creek to Powhatan Ave. that connects other phases of the Elizabeth River Trail. |
103978 |
Elizabeth River Trail, Phase 5 |
Norfolk |
Construct a bicycle and pedestrian trail from 25th St to 21st St that connects other phases of the Elizabeth River Trail. The City of Norfolk refers to this segment as Phase 4C. |
13427 |
Wythe Creek Road Widening - Phase I |
Poquoson |
Widen Wythe Creek Rd from Alphus St to the City of Hampton line |
102985 |
Westhaven Bicycle Improvements |
Portsmouth |
Construct bike lanes and multi-use path to connect existing bicycle lanes on Clifford St and Airline Blvd |
99172 |
North Main Street Multi-Use Trail - Phase II |
Suffolk |
Construct a multi-use trail from the south entrance of the VDOT District Complex to the existing sidewalk on Wal-Mart property |
12546 |
Laskin Road Widening |
Virginia Beach |
Widen Laskin Rd to 6 lanes from 0.2 mi west of First Colonial Rd (Rte 408) to 0.3 mi east of Birdneck Rd |
13482 |
Princess Anne Road Reconstruction |
Virginia Beach |
Reconstruct Princess Anne Rd on an 8 lane right of way from 0.2 mi east of Dam Neck Rd to Nimmo Pkwy and construct new segment of Nimmo Pkwy from Princess Anne Rd to Holland Rd (Rte 410) |
14603 |
Lynnhaven Parkway Extension - Phase XI |
Virginia Beach |
Construct extension of Lynnhaven Pkwy from 0.5 mi east of Centerville Tpke to 0.2 mi west of Indian River Rd (Rte 407) |
15827 |
Holland Road Widening |
Virginia Beach |
Widen Holland Rd to 4 lanes from 0.2 mi north of Dam Neck Rd to 0.2 mi south of Nimmo Pkwy |
15828 |
Dam Neck Road Extension |
Virginia Beach |
Widen Dam Neck Rd to 4 lanes and extend from Indian River Rd (Rte 407) to 0.5 miles west of Princess Anne Rd (Rte 165) |
52058 |
Nimmo Parkway Construction |
Virginia Beach |
Construct 4 lanes on 6 lanes of right of way from Holland Rd (Rte 410) to 0.4 mi west of General Booth Blvd (Rte 149) |
52148 |
Wesleyan Drive Widening |
Virginia Beach |
Widen Wesleyan Drive to 4 lanes from the City of Norfolk line to Baker Rd |
55202 |
Witchduck Road Widening |
Virginia Beach |
Widen Witchduck Rd to 6 lanes from I-264 to Virginia Beach Blvd (58) |
93522 |
Princess Anne Road Reconstruction - ARRA |
Virginia Beach |
Reconstruct Princess Anne Rd on an 8 lane right of way from 0.2 mi east of Dam Neck Rd to Nimmo Pkwy and construct new segment of Nimmo Pkwy from Princess Anne Rd to Holland Rd (Rte 410) |
97215 |
Safe Routes to School - Bayside Middle School |
Virginia Beach |
Install sidewalks on Newtown Rd from Bayside Middle to Diamond Springs Rd |
100539 |
Providence Road Pedestrian Signals and ADA Ramps |
Virginia Beach |
Install pedestrian signals and ADA ramps at existing signalized intersections and add any missing sidewalk sections along Providence Rd. from Matyiko Drive to Whitehurst Landing Road. |
13714 |
Lakeside Drive Intersection Improvements |
York County |
Construct right-turn and left-turn lanes on Lakeside Dr from George Washington Memorial Hwy (Rte 17) to Dare Rd (Rte 621) |
60843 |
George Washington Memorial Highway Widening |
York County |
Widen George Washington Memorial Hwy from 4 to 6 lanes from 1.3 mi south to 1.5 mi north of Lakeside Dr (Rte 620) |
84484 |
Capital Landing Road Bicycle Improvements |
York County |
Construct a bikeway on Capitol Landing Rd from East Rochambeau Dr to the Queens Creek Bridge (on the City of Williamsburg line). |
94543 |
York County Pedestrian Improvements - ARRA |
York County |
Construct sidewalks on Hampton Hwy from First St to Indian Summer Dr, Hubbard Ln from Penniman Rd to Colonial Ave, and Commons Wy from Bypass Rd to Williamsburg Commons. |
101932 |
York County Pedestrian Improvements |
York County |
Construct sidewalks on Hampton Hwy from First St to Indian Summer Dr, Hubbard Ln from Penniman Rd to Colonial Ave, and Commons Wy from Bypass Rd to Williamsburg Commons. |
Updated 6/22/2015
Resources
- Meetings and Agendas
- + Member Locations
- + Long Range Transportation Planning
- Title VI/Environmental Justice Methodology Tool
- Transportation Improvement Program
- + Transportation
- + Operations & ITS
- + Funding
- SMART SCALE
- + Reports & Data
- Unified Planning Work Program
- Regional Transit Advisory Panel (RTAP)
- Public Notices
- + Public Information
- Commonwealth Transportation Board
- Other Links
- FAQ's
- Procurement & DBE Program