TPO Banner

Home / About Us / Calendar / Staff / Comments / Employment

HRTPO CROSSINGS
is now in a blog format

Passenger Rail Chronicle
The HRTPO blog
for all things rail.

YouTube Logo

 

 

 

TTAC and Sub-Committee Meetings Archive

2010

January February March
April May June
July August September
October November December

Hampton Roads Transportation Operations (HRTO)
Subcommittee Meeting

Date:Tuesday, December 14, 2010
Time: 9:30 am

Location:
The Regional Board Room
723 Woodlake Drive
Chesapeake, VA

Agenda

Triumphs and Trials – Chesapeake

RCTO Performance Measures

Work Area Protection Manual – Revisions


 

Interagency Consultation Group Meeting

Date: December 1, 2010

AGENDA

Presentation

Related Links

Consultation Procedures for the Hampton Roads Ozone Nonattainment Area: In Support of the Transportation Conformity Regulations."


Transportation Technical Advisory Committee (TTAC)

Date: December 1, 2010

Action Summary Report

Full agenda packet, click HERE

1. CALL TO ORDER

2. PUBLIC COMMENT PERIOD (Verbal comments - Limit 3 minutes per individual)

3. PUBLIC COMMENTS (Written comments included in agenda packet)

4. APPROVAL OF AGENDA

5. MINUTES

6. FY 2009-2012 TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
AMENDMENT: SUFFOLK

7. FY 2009-2012 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) REVISION: REALLOCATION OF RSTP FUNDS - HRT

8. 2030 LONG-RANGE TRANSPORTATION PLAN AMENDMENT – SKIFFES CREEK CONNECTOR: JAMES CITY COUNTY

9. REVIEW OF UNOBLIGATED CMAQ/RSTP FUNDS: STATUS REPORT

10. FY 2012 UNIFIED PLANNING WORK PROGRAM: REVIEW OF REGIONAL PLANNING PRIORITIES

11. TRANSPORTATION PROJECT PRIORITIZATION: PROJECT EVALUATION AND SCORING

12. CONGESTION MANAGEMENT PROCESS – THE STATE OF TRANSPORTATION IN HAMPTON ROADS: DRAFT REPORT

13. PRELIMINARY ENGINEERING PROJECTS IN THE LONG-RANGE
TRANSPORTATION PLAN: FHWA

14. DOWNTOWN TUNNEL CEILING PANEL REMOVAL PROJECT: VDOT

15. EAST COAST GREENWAY AND SOUTH HAMPTON ROADS TRAIL

16. CORRESPONDENCE OF INTEREST

17. FOR YOUR INFORMATION

18. OLD/NEW BUSINESS

ADJOURNMENT

ENCLOSURES

11. TRANSPORTATION PROJECT PRIORITIZATION: PROJECT EVALUATION AND SCORING

12. CONGESTION MANAGEMENT PROCESS – THE STATE OF TRANSPORTATION IN HAMPTON ROADS: DRAFT REPORT

PRESENTATIONS

11. TRANSPORTATION PROJECT PRIORITIZATION: PROJECT EVALUATION AND SCORING

12. CONGESTION MANAGEMENT PROCESS – THE STATE OF TRANSPORTATION IN HAMPTON ROADS: DRAFT REPORT

14. DOWNTOWN TUNNEL CEILING PANEL REMOVAL PROJECT: VDOT

15. EAST COAST GREENWAY AND SOUTH HAMPTON ROADS TRAIL

HANDOUTS


Transportation Technical Advisory Committee (TTAC)

Date: November 3, 2010

Action Summary Report

Full agenda packet, click HERE

1. CALL TO ORDER

2. PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)

3. APPROVAL OF AGENDA

4. MINUTES

5. 2030 LONG-RANGE TRANSPORTATION PLAN AMENDMENT – ROUTE 460: VDOT

6. REVIEW OF TIP REVISION PROCEDURES

7. REVIEW OF UNOBLIGATED CMAQ/RSTP FUNDS: STATUS REPORT

8. TRANSIT VISION PLAN: STATUS REPORT

9. 2009 SOCIOECONOMIC DATA BY TRANSPORTATION ANALYSIS ZONE: FINAL REPORT

10. HRTPO ADVISORY COMMITTEES: STATUS REPORT

11. CORRESPONDENCE OF INTEREST

12. PUBLIC COMMENTS

13. FOR YOUR INFORMATION

14. OLD/NEW BUSINESS

ADJOURNMENT

ENCLOSURES

9. 2009 SOCIOECONOMIC DATA BY TRANSPORTATION ANALYSIS ZONE: FINAL REPORT

PRESENTATIONS

6. REVIEW OF TIP REVISION PROCEDURES

8. TRANSIT VISION PLAN: STATUS REPORT

9. 2009 SOCIOECONOMIC DATA BY TRANSPORTATION ANALYSIS ZONE: FINAL REPORT

HANDOUTS

5. 2030 LONG-RANGE TRANSPORTATION PLAN AMENDMENT – ROUTE 460

5. 2030 LONG-RANGE TRANSPORTATION PLAN AMENDMENT – ROUTE 460: Fiscal Constraint

12. PUBLIC COMMENTS


2034 Long-Range Transportation Plan Subcommittee

Date: Wednesday, October 13, 2010
Time: 10:00am

The Regional Board Room
723 Woodlake Drive
Chesapeake, VA

AGENDA


Hampton Roads Transportation Operations (HRTO)
Subcommittee Meeting

Date:Tuesday, October 12, 2010
Time: 9:30 am

Location:
Traffic Management Center
3556 Dam Neck Rd
Virginia Beach, VA

Agenda

PRESENTATIONS

Traffic Signal Photo Monitoring System

Bridge Deck Sensors


Transportation Technical Advisory Committee (TTAC)

Date: October 6, 2010
Time: 9:30 am

Full agenda packet, click HERE

1. CALL TO ORDER

2. PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)

3. APPROVAL OF AGENDA

4. MINUTES

5. FY 2009-2012 TRANSPORTATION IMPROVEMENT PROGRAM REVISION:
REQUEST TO REALLOCATE CMAQ FUNDS - NORFOLK

6. FY 2009-2012 TRANSPORTATION IMPROVEMENT PROGRAM REVISION:
REQUEST TO REALLOCATE RSTP FUNDS - CHESAPEAKE

7. FY 2009-2012 TRANSPORTATION IMPROVEMENT PROGRAM AMENDMENT: VIRGINIA BEACH

8. VDOT 2010 PERFORMANCE AND FINANCIAL AUDIT

9. 2034 LRTP PROJECT PRIORITIZATION: SCHEDULE

10. 2034 LRTP PROJECT PRIORITIZATION OUTREACH STRATEGY

11. INDIAN RIVER ROAD/KEMPSVILLE ROAD NON-TRADITIONAL INTERSECTION IMPROVEMENTS

12. REGIONAL PERFORMANCE MEASURES

13. CORRESPONDENCE OF INTEREST

14. PUBLIC COMMENTS

15. FOR YOUR INFORMATION

16. OLD/NEW BUSINESS

ADJOURNMENT

ENCLOSURES

PRESENTATIONS

11. INDIAN RIVER ROAD/KEMPSVILLE ROAD NON-TRADITIONAL INTERSECTION IMPROVEMENTS

12. REGIONAL PERFORMANCE MEASURES

HANDOUTS

10. 2034 LRTP PROJECT PRIORITIZATION OUTREACH STRATEGY

13. CORRESPONDENCE OF INTEREST

14. PUBLIC COMMENTS

ACTION SUMMARY REPORT

2034 Long-Range Transportation Plan Subcommittee

Date: September 16, 2010
Time: 10:00am

AGENDA

Presentations

VDOT Processes

Refinement of Transportation Project Prioritization Tool


TRAFFIX Oversight Subcommittee Meeting

Wednesday, September 1, 2009

AGENDA

Presentation


Transportation Technical Advisory Committee (TTAC)

Date: September 1, 2010

CALL TO ORDER

PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)

APPROVAL OF AGENDA

AGENDA (Full agenda packet, HERE; by section below)

1. Minutes of July 7, 2010

2. Hampton Roads Congestion Management Process (CMP) 2010 Update: Final Report

3. FY 2009-2012 Transportation Improvement Program Amendment: Update of
Public Transportation Section of TIP

4. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds - Norfolk

5. Transportation Technical Subcommittee Meeting of July 26, 2010: Summary Report

6. CMAQ/RSTP Reconciliation Work: Status Report

7. Contingency Funding on Regional ARRA Projects: Status Report

8. Indian River Road/Kempsville Road Non-Traditional Intersection Improvements

9. Developing Regional Transportation Priorities

10. For Your Information

11. Old/New Business

ADJOURNMENT

ENCLOSURES

E2 CMP Final Report TTAC

E10F HUD Grant Proposal

PRESENTATIONS

9. Developing Regional Transportation Priorities

HANDOUTS

7. Contingency Funding on Regional ARRA Projects: Status Report

10-A. For Your Information: Transportation Air Quality Conformity Analysis Approved


2034 Long Range Transportation Plan Subcommittee Meeting

Date: Friday, August 27, 2010  

Agenda


Hampton Roads Transportation Operations (HRTO)
Subcommittee Meeting

Date: Tuesday, August 10, 2010

Agenda

HANDOUTS

Ranking of VDOT Candidate ITS Projects by HRTO


2034 Long Range Transportation Plan Subcommittee Meeting

Date: Wednesday, August 4, 2010

Agenda

HANDOUTS

1. Prioritization of Projects

2. Revenue Estimates

3. Outreach Activities


Transportation Technical Advisory Committee (TTAC)

Date: August 4, 2010
Time: CANCELLED


Transportation Technical Subcommittee

Date: Monday, July 26, 2010

Agenda


Transportation Technical Advisory Committee (TTAC)

Date: July 7, 2010

CALL TO ORDER

PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)

APPROVAL OF AGENDA

AGENDA (Full agenda packet, HERE; by section below)

1. Minutes of June 2, 2010

2. Carolina Road Corridor Study: Final Report

3. FY 2010 CMAQ/RSTP Reserve Funds

4. Procedures for Revising the Transportation Improvement Program

5. FY 2009-2012 Transportation Improvement Program Revision: Request to Reallocate CMAQ and RSTP Funds - Newport News

6. FY 2009-2012 Transportation Improvement Program Revision: Request for CMAQ Cost Overrun Funds - Portsmouth

7. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds - WATA

8. FY 2009-2012 Transportation Improvement Program Revision: Request to Allocate
Statewide ARRA Funds to Norfolk LRT Project - VDOT

9. VDOT Review of CMAQ/RSTP Unobligated Balances

10. State Matching Funds for RSTP to be Tied to Regional Transportation and Land Use
Performance Measures

11. Project Prioritization and Selection Process: Final Report

12. Hampton Roads 2034 Long-Range Transportation Plan: Status Report

13. Hampton Roads Congestion Management Process (CMP): 2010 Update

14. VDOT Hurricane Evacuation Traffic Control Plan: HRTO Recommendation

15. Draft Hampton Roads Existing Land Use: 2009 Socioeconomic Base Year Update

16. Official Designation of TRAFFIX Oversight Subcommittee

17. Correspondence of Interest

18. For Your Information

19. Old/New Business

ADJOURNMENT

ENCLOSURES

2. Carolina Road Corridor Study

9. VDOT Review of Unobligated CMAQRSTP Funds

11A. Final HRTPO Program Priorities Methodology Report

11B. Final HRTPO Program Priorities Methodology Report Appendix

13. CMP Draft Report TTAC

14. Tech Analysis of Hurricane Evac Plan by HRTPO staff for HRTO

15. HRTPO 2009 Socioeconomic Base Year DRAFT Update

18D. SEHSR HRTPO comments

PRESENTATIONS

10. Regional Transportation and Land Use Performance Measures

11. CMAQ / RSTP Review Results

12. HRTPO Project Prioritization

13. 2034 Long-Range Transportation Plan: Status Report

14. Hampton Roads Congestion Management Process: 2010 Update

15. HRTO Review of VDOT’s Traffic Control Plan for Evacuation

HANDOUTS

3. Handout new agenda item ARRA


Hampton Roads Transportation Operations (HRTO)
Subcommittee Meeting

Tuesday, June 15, 2010

Agenda (Includes Minutes from April 20, 2010 meeting.)

PRESENTATIONS

VDOT Evacuation Plans

HANDOUTS

Letter to Harry Colestock


Transportation Technical Advisory Committee (TTAC)

Date: June 2, 2010

CALL TO ORDER

PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)

APPROVAL OF AGENDA

AGENDA (Full agenda packet, HERE; by section below)

1. Minutes of May 5, 2010

2. FY 2011 Unified Planning Work Program: Final Draft

3. Pruden Boulevard Corridor Study: Final Report

4. Regional Land Use Research Scan: Final Report

5. Draft FY 2011-2016 Six-Year Improvement Program

6. Hampton Roads 2030 LRTP and FY 2009-2012 TIP Air Quality Conformity

7. Requesting TIP Revisions and Transfers of CMAQ and RSTP Allocations

8. Public Participation Pilot Project: Outreach Via Elementary Schools

9. Carolina Road Corridor Study: Draft Report

10. TIGER II Discretionary Grants Program: Status Report

11. Regional Highway System for Which Cities Will Routinely Notify VDOT of Planned
Closures


12. For Your Information

13. Old/New Business

ADJOURNMENT

ENCLOSURES

2. FY 2011 Unified Planning Work Program: Final Draft

3a. Pruden Boulevard Corridor Study: Final Report

3b. Pruden Boulevard Corridor Study: Final Report Technical Appendices

4. Regional Land Use Research Scan: Final Report

6. Hampton Roads 2030 LRTP and FY 2009-2012 TIP Air Quality Conformity

10. TIGER II Discretionary Grants Program: Status Report

13f. Old/New Business- Preliminary National Rail Plan

PRESENTATIONS

5. Draft FY 2011-2016 Six-Year Improvement Program

6. Hampton Roads 2030 LRTP and FY 2009-2012 TIP Air Quality Conformity

8. Public Participation Pilot Project: Outreach Via Elementary Schools

9. Carolina Road Corridor Study: Draft Report

11. Regional Highway System for Which Cities Will Routinely Notify VDOT of Planned
Closures

HANDOUTS

12f. For Your Information - Federal Railroad Administration: Preliminary National Rail Plan: HRTPO STAFF TECHNICAL COMMENTS

12h. For Your Information - Public Comments

13. Old Business


2034 Long-Range Transportaion Plan Subcommittee

Date: Wednesday June 2, 2010

AGENDA

PRESENTATIONS & HANDOUTS


Transportation Technical Subcommittee

Date: Monday, May 24, 2010

CALL TO ORDER

PUBLIC COMMENT PERIOD
(Limit: 3 minutes per individual)

APPROVAL OF AGENDA (Full agenda packet)

AGENDA

1. OVERVIEW OF TIGER II DISCRETIONARY GRANTS PROGRAM
HRTPO staff will provide a brief overview of the TIGER II grants program, including
the criteria by which the pre-applications and final applications will be evaluated by
USDOT. Attached is the Interim Notice of Funding Availability for the TIGER II program,
which includes project selection criteria and pre-application and application requirements, procedures, and deadline dates.

Attachment 1
.
2. REVIEW OF PROPOSALS FOR PRE-APPLICATION FOR TIGER II

HRTPO staff will lead the group in a review of the projects proposed to be submitted
during the pre-application period for the TIGER II program.

3. OLD/NEW BUSINESS

ADJOURNMENT

Summary Minutes

Transportation Technical Advisory Committee (TTAC)

Date: May 5, 2010

CALL TO ORDER

PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)

APPROVAL OF AGENDA

AGENDA (to print full agenda packet, click here)

1. Minutes of April 7, 2010

2. FY 2009-2012 Transportation Improvement Program Amendment: Coordinated
Plan Projects

3. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds-Hampton

4. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds-Hampton

5. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds-Portsmouth

6. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds-Virginia Beach

7. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate RSTP Funds-WATA

8. CMAQ/RSTP Project Selection Process- FY 2011-2015: Report

9. HRTPO Project Prioritization and Selection Process: Economic Vitality

10. Transit Vision Plan Phase II: Status Report

11. Regional Land Use Research Scan: Draft Report

12. Pruden Boulevard Corridor Study: Draft Report

13. TIGER II Discretionary Grants Program

14. For Your Information

15. Old/New Business

ADJOURNMENT

ENCLOSURES

8. CMAQ/RSTP Project Selection Process- FY 2011-2015: Report

11. Regional Land Use Research Scan: Draft Report

HANDOUTS

9. HRTPO Project Prioritization and Selection Process: Economic Vitality

12. Pruden Boulevard Corridor Study: Draft Report

PRESENTATIONS

9. HRTPO Project Prioritization and Selection Process: Economic Vitality

10. Transit Vision Plan Phase II: Status Report

11. Regional Land Use Research Scan: Draft Report

12. Pruden Boulevard Corridor Study: Draft Report


Hampton Roads Transportation Operations (HRTO)
Subcommittee Meeting

Date: April 20, 2010
Time: 9:30-11:30am

Location: Sandy Bottom Nature Park, 1255 Big Bethel Rd, Hampton

Agenda (Includes Minutes from February 23, 2010)


Interagency Consultation Group Meeting

Date: April 7, 2010

AGENDA

Presentation


Transportation Technical Advisory Committee (TTAC)

Date: April 7, 2010

CALL TO ORDER

PUBLIC COMMENT PERIOD
(Limit 3 minutes per individual)

APPROVAL OF AGENDA


AGENDA (Full Agenda PDF)

1. Minutes of March 3, 2010

2. FY 2009-2012 Transportation Improvement Program Amendment: Virginia Beach

3. FY 2009-2012 Transportation Improvement Program Amendment: VDOT

4. FY 2009-2012 Transportation Improvement Program Amendment: HRTPO

5. Nansemond Parkway Corridor Study: Final Report

6. HUD Sustainability Grants Program

7. FY 2011 Unified Planning Work Program: Draft 2

8. Hampton Roads Passenger Rail Initiatives: DRPT

9. Identifying Potential Sources of Funding for the Norfolk LRT Project

10. 2034 Long-Range Transportation Plan: Review of Draft Candidate Projects

11. Waterborne Transit Concepts Study

12. Strategy for Re-Obligation of ARRA Funds

13. MOVES2010 Motor Vehicle Emissions Model

14. For Your Information

15. Old/New Business

ADJOURNMENT

ENCLOSURES

E5A. Nansemond Parkway Corridor Study: Final Report

E5B. Nansemond Parkway Corridor Study: Final Report -Technical Appendices

E7. FY 2011 Unified Planning Work Program: Draft 2

PRESENTATIONS

7. FY 2011 Unified Planning Work Program: Draft 2

8. Hampton Roads Passenger Rail Initiatives: DRPT

11. Waterborne Transit Concepts Study

12. Strategy for Re-Obligation of ARRA Funds

13. MOVES2010 Motor Vehicle Emissions Model

HANDOUTS

15. Norfolk TIP Amendment


2034 Long-Range Transportaion Plan Subcommittee

Date: April 7, 2010

AGENDA


Transportation Technical Advisory Committee (TTAC)

Date: March 3, 2010

CALL TO ORDER

PUBLIC COMMENT PERIOD
(Limit 3 minutes per individual)

APPROVAL OF AGENDA


AGENDA (Full Agenda PDF)

1. Minutes of February 3, 2010

2. FY 2009-2012 Transportation Improvement Program Amendment: New CMAQ& RSTP Projects and Allocations

3. Regional Safety Study – General Crash Data and Trends Update: Final Report

4. Hampton Roads Congestion Management Process (CMP): Level of Service Results

5. VDOT Financial Estimates: 2034 Constrained Long-Range Transportation Plan

6. FY 2010 Unified Planning Work Program Amendments

7. FY 2011 Unified Planning Work Program: Draft 1

8. Nansemond Parkway Corridor Study: Draft Report

9. Proposed Air Quality Standards for Ozone

10. Hurricane Lane Reversal Plan

11. 2030 Long-Range Transportation Plan Amendments

12. For Your Information

13. Old/New Business

ADJOURNMENT

ENCLOSURES

E3. Hampton Roads Regional Safety Study: General Crash Data and Trends-2010 Update

E4. CMP Final Existing 2009 LOS with Maps

E8. Draft Nansemond Parkway Corridor Study

PRESENTATIONS

5. 2034 Long Range Transportation Plan Financial Estimates

7. Draft 1 - FY 2011 Unified Planning Work Program

8. Nansemond Parkway Corridor Study

9. Proposed Air Quality Standards for Ozone

10. Hurricane Lane Reversal Plan

11. 2030 Long Range Transportation Plan Amendments

HANDOUTS

6. FY 2010 Unified Planning Work Program: Task 3.2 Amendment

7. Draft 1 - FY 2011 Unified Planning Work Program

11. Amendments to the 2030 Long-Range Transportation Plan for Hampton Roads


2034 Long Range Transportation Plan Subcommittee

Date: February 25, 2010

Agenda


Hampton Road Transportation Operations (HRTO) Subcommittee

Date: February 23, 2010

Agenda

Attachments

PRESENTATIONS

3. HRTO Designation & Composition
4. Communication Conduit - Norfolk
6. Regional Concept For Transportation Operations (RCTO) Update
7. Move Over Law


2034 Long Range Transportation Plan Subcommittee

Date: February 3, 2010

Agenda


TTAC February Meeting

Date: February 3, 2010

CALL TO ORDER PUBLIC

COMMENT PERIOD (Limit 3 minutes per individual)

APPROVAL OF AGENDA

AGENDA

1. Minutes of January 6, 2010

2. 2030 Long-Range Transportation Plan Amendment: Status Report

3. State Matching Funds for RSTP to be Tied to Regional Transportation and Land Use Performance Measures

4. Regional Safety Study – General Crash Data and Trends Update: Draft Report

5. Hampton Roads Congestion Management Process (CMP): Draft Level of Service Results

6. Designation and Composition of the Hampton Roads Transportation Operations Subcommittee

7. For Your Information

8. Old/New Business

ADJOURNMENT

ENCLOSURES

4.General Crash Data and Trends 2009 Draft Report

PRESENTATIONS

Agenda4-Crash_Data

Agenda5-CMP_Draft_Results

Agenda6-HRTO_Subcommittee

HANDOUTS

Handout_Agenda5-CMP_Draft_Results

Handout_Agenda7-ARRAstatus

Handout_Agenda7-NN_Rail_EIS_Review

Handout_Agenda7-Rail_EIS_Review


Transportation Technical Advisory Committee (TTAC)

January 6, 2010

Agenda and Attachments

Minutes (unofficial until approved)

ENCLOSURES

E.10 Coliseum Central Special Events Management Plan Study Report

PRESENTATIONS

6. Proposed Hampton Roads Fast Ferry System: MetroMarine Holdings, Inc.
8. Locally Administered ARRA Projects ‐ Milestone Deadlines and Risk Management:
VDOT

9. Urban Construction Initiative: VDOT
10. Coliseum Central Special Events Management Plan Study: Final Approval

HANDOUTS

3. Selected CMAQ/RSTP Projects
8. Hampton Roads Stimulus Projects-Status


Next Meeting

Previous Month's Meeting

Meeting Archives

Hot Topics

Virginia Receives Preliminary Approval to Toll Interstate 95


The Hampton Roads Military
Transportation Needs Study

has generated news media spots.
Go to our HRTPO In The News
page to watch.

Military Transportation Needs Study


The HRTPO Board approved a Hampton Roads Transportation Project Priorities for the 2034 Long-Range Transportation Plan. To see where these projects are located in the region, use our
Visualization tool
.


2011 Virginia Hurricane Guide
Now Available


CTB Public Meetings Scheduled
October 24, 2010


Keep Hampton Roads Moving
Navigating the Future: Hampton Roads 2034 Long-Range Transportation Plan

Upcoming Meetings

Citizen Transportation Advisory Committee (CTAC)
Transportation Technical Advisory Committee (TTAC)
Freight Transportation Advisory Committee (FTAC)
Transportation Advisory Committee (TAC)

To be Announced

 

HRTPO Legislative Ad-hoc Committee

To be Announced

High-Speed and Intercity Passenger Rail Task Force

To be Announced

Hampton Roads Transportation Operations Subcommittee

To be Announced

All Meetings are at the Regional Building, Chesapeake, VA, unless otherwise noted.


 

© 2009 Hampton Roads TPO
Read ou
r Privacy Policy

Website Comments & Questions

Hampton Roads TPO
723 Woodlake Drive
Chesapeake, VA 23320
757-420-8300

Sign up for Our Email Newsletter
Email:
For Email Marketing you can trust