TTAC and Sub-Committee Meetings Archive
2010
Hampton Roads Transportation Operations (HRTO)
Subcommittee Meeting
Date:Tuesday, December 14, 2010
Time: 9:30 am
Location:
The Regional Board Room
723 Woodlake Drive
Chesapeake, VA
Agenda
Triumphs and Trials – Chesapeake
RCTO Performance Measures
Work Area Protection Manual – Revisions
Interagency Consultation Group Meeting
Date: December 1, 2010
AGENDA
Presentation
Related Links
Consultation Procedures for the Hampton Roads Ozone Nonattainment Area: In Support of the Transportation Conformity Regulations."
Transportation Technical Advisory Committee (TTAC)
Date: December 1, 2010
Action Summary Report
Full agenda packet, click HERE
1. CALL TO ORDER
2. PUBLIC COMMENT PERIOD (Verbal comments - Limit 3 minutes per individual)
3. PUBLIC COMMENTS (Written comments included in agenda packet)
4. APPROVAL OF AGENDA
5. MINUTES
6. FY 2009-2012 TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
AMENDMENT: SUFFOLK
7. FY 2009-2012 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) REVISION:
REALLOCATION OF RSTP FUNDS - HRT
8. 2030 LONG-RANGE TRANSPORTATION PLAN AMENDMENT – SKIFFES CREEK
CONNECTOR: JAMES CITY COUNTY
9. REVIEW OF UNOBLIGATED CMAQ/RSTP FUNDS: STATUS REPORT
10. FY 2012 UNIFIED PLANNING WORK PROGRAM: REVIEW OF REGIONAL
PLANNING PRIORITIES
11. TRANSPORTATION PROJECT PRIORITIZATION: PROJECT EVALUATION AND
SCORING
12. CONGESTION MANAGEMENT PROCESS – THE STATE OF TRANSPORTATION IN
HAMPTON ROADS: DRAFT REPORT
13. PRELIMINARY ENGINEERING PROJECTS IN THE LONG-RANGE
TRANSPORTATION PLAN: FHWA
14. DOWNTOWN TUNNEL CEILING PANEL REMOVAL PROJECT: VDOT
15. EAST COAST GREENWAY AND SOUTH HAMPTON ROADS TRAIL
16. CORRESPONDENCE OF INTEREST
17. FOR YOUR INFORMATION
18. OLD/NEW BUSINESS
ADJOURNMENT
ENCLOSURES
11. TRANSPORTATION PROJECT PRIORITIZATION: PROJECT EVALUATION AND
SCORING
12. CONGESTION MANAGEMENT PROCESS – THE STATE OF TRANSPORTATION IN
HAMPTON ROADS: DRAFT REPORT
PRESENTATIONS
11. TRANSPORTATION PROJECT PRIORITIZATION: PROJECT EVALUATION AND
SCORING
12. CONGESTION MANAGEMENT PROCESS – THE STATE OF TRANSPORTATION IN
HAMPTON ROADS: DRAFT REPORT
14. DOWNTOWN TUNNEL CEILING PANEL REMOVAL PROJECT: VDOT
15. EAST COAST GREENWAY AND SOUTH HAMPTON ROADS TRAIL
HANDOUTS
Transportation Technical Advisory Committee (TTAC)
Date: November 3, 2010
Action Summary Report
Full agenda packet, click HERE
1. CALL TO ORDER
2. PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)
3. APPROVAL OF AGENDA
4. MINUTES
5. 2030 LONG-RANGE TRANSPORTATION PLAN AMENDMENT – ROUTE 460: VDOT
6. REVIEW OF TIP REVISION PROCEDURES
7. REVIEW OF UNOBLIGATED CMAQ/RSTP FUNDS: STATUS REPORT
8. TRANSIT VISION PLAN: STATUS REPORT
9. 2009 SOCIOECONOMIC DATA BY TRANSPORTATION ANALYSIS ZONE: FINAL
REPORT
10. HRTPO ADVISORY COMMITTEES: STATUS REPORT
11. CORRESPONDENCE OF INTEREST
12. PUBLIC COMMENTS
13. FOR YOUR INFORMATION
14. OLD/NEW BUSINESS
ADJOURNMENT
ENCLOSURES
9. 2009 SOCIOECONOMIC DATA BY TRANSPORTATION ANALYSIS ZONE: FINAL
REPORT
PRESENTATIONS
6. REVIEW OF TIP REVISION PROCEDURES
8. TRANSIT VISION PLAN: STATUS REPORT
9. 2009 SOCIOECONOMIC DATA BY TRANSPORTATION ANALYSIS ZONE: FINAL
REPORT
HANDOUTS
5. 2030 LONG-RANGE TRANSPORTATION PLAN AMENDMENT – ROUTE 460
5. 2030 LONG-RANGE TRANSPORTATION PLAN AMENDMENT – ROUTE 460: Fiscal Constraint
12. PUBLIC COMMENTS
2034 Long-Range Transportation Plan Subcommittee
Date: Wednesday, October 13, 2010
Time: 10:00am
The Regional Board Room
723 Woodlake Drive
Chesapeake, VA
AGENDA
Hampton Roads Transportation Operations (HRTO)
Subcommittee Meeting
Date:Tuesday, October 12, 2010
Time: 9:30 am
Location:
Traffic Management Center
3556 Dam Neck Rd
Virginia Beach, VA
Agenda
PRESENTATIONS
Traffic Signal Photo Monitoring System
Bridge Deck Sensors
Transportation Technical Advisory Committee (TTAC)
Date: October 6, 2010
Time: 9:30 am
Full agenda packet, click HERE
1. CALL TO ORDER
2. PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)
3. APPROVAL OF AGENDA
4. MINUTES
5. FY 2009-2012 TRANSPORTATION IMPROVEMENT PROGRAM REVISION:
REQUEST TO REALLOCATE CMAQ FUNDS - NORFOLK
6. FY 2009-2012 TRANSPORTATION IMPROVEMENT PROGRAM REVISION:
REQUEST TO REALLOCATE RSTP FUNDS - CHESAPEAKE
7. FY 2009-2012 TRANSPORTATION IMPROVEMENT PROGRAM AMENDMENT:
VIRGINIA BEACH
8. VDOT 2010 PERFORMANCE AND FINANCIAL AUDIT
9. 2034 LRTP PROJECT PRIORITIZATION: SCHEDULE
10. 2034 LRTP PROJECT PRIORITIZATION OUTREACH STRATEGY
11. INDIAN RIVER ROAD/KEMPSVILLE ROAD NON-TRADITIONAL INTERSECTION
IMPROVEMENTS
12. REGIONAL PERFORMANCE MEASURES
13. CORRESPONDENCE OF INTEREST
14. PUBLIC COMMENTS
15. FOR YOUR INFORMATION
16. OLD/NEW BUSINESS
ADJOURNMENT
ENCLOSURES
PRESENTATIONS
11. INDIAN RIVER ROAD/KEMPSVILLE ROAD NON-TRADITIONAL INTERSECTION
IMPROVEMENTS
12. REGIONAL PERFORMANCE MEASURES
HANDOUTS
10. 2034 LRTP PROJECT PRIORITIZATION OUTREACH STRATEGY
13. CORRESPONDENCE OF INTEREST
14. PUBLIC COMMENTS
ACTION SUMMARY REPORT
2034 Long-Range Transportation Plan Subcommittee
Date: September 16, 2010
Time: 10:00am
AGENDA
Presentations
VDOT Processes
Refinement of Transportation Project Prioritization Tool
TRAFFIX Oversight Subcommittee Meeting
Wednesday, September 1, 2009
AGENDA
Presentation
Transportation Technical Advisory Committee (TTAC)
Date: September 1, 2010
CALL TO ORDER
PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)
APPROVAL OF AGENDA
AGENDA (Full agenda packet, HERE; by section below)
1. Minutes of July 7, 2010
2. Hampton Roads Congestion Management Process (CMP) 2010 Update: Final Report
3. FY 2009-2012 Transportation Improvement Program Amendment: Update of
Public Transportation Section of TIP
4. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds - Norfolk
5. Transportation Technical Subcommittee Meeting of July 26, 2010: Summary Report
6. CMAQ/RSTP Reconciliation Work: Status Report
7. Contingency Funding on Regional ARRA Projects: Status Report
8. Indian River Road/Kempsville Road Non-Traditional Intersection Improvements
9. Developing Regional Transportation Priorities
10. For Your Information
11. Old/New Business
ADJOURNMENT
ENCLOSURES
E2 CMP Final Report TTAC
E10F HUD Grant Proposal
PRESENTATIONS
9. Developing Regional Transportation Priorities
HANDOUTS
7. Contingency Funding on Regional ARRA Projects: Status Report
10-A. For Your Information: Transportation Air Quality Conformity Analysis Approved
2034 Long Range Transportation Plan Subcommittee Meeting
Date: Friday, August 27, 2010
Agenda
Hampton Roads Transportation Operations (HRTO)
Subcommittee Meeting
Date: Tuesday, August 10, 2010
Agenda
HANDOUTS
Ranking of VDOT Candidate ITS Projects by HRTO
2034 Long Range Transportation Plan Subcommittee Meeting
Date: Wednesday, August 4, 2010
Agenda
HANDOUTS
1. Prioritization of Projects
2. Revenue Estimates
3. Outreach Activities
Transportation Technical Advisory Committee (TTAC)
Date: August 4, 2010
Time: CANCELLED
Transportation Technical Subcommittee
Date: Monday, July 26, 2010
Agenda
Transportation Technical Advisory Committee (TTAC)
Date: July 7, 2010
CALL TO ORDER
PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)
APPROVAL OF AGENDA
AGENDA (Full agenda packet, HERE; by section below)
1. Minutes of June 2, 2010
2. Carolina Road Corridor Study: Final Report
3. FY 2010 CMAQ/RSTP Reserve Funds
4. Procedures for Revising the Transportation Improvement Program
5. FY 2009-2012 Transportation Improvement Program Revision: Request to Reallocate CMAQ and RSTP Funds - Newport News
6. FY 2009-2012 Transportation Improvement Program Revision: Request for CMAQ Cost Overrun Funds - Portsmouth
7. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds - WATA
8. FY 2009-2012 Transportation Improvement Program Revision: Request to Allocate
Statewide ARRA Funds to Norfolk LRT Project - VDOT
9. VDOT Review of CMAQ/RSTP Unobligated Balances
10. State Matching Funds for RSTP to be Tied to Regional Transportation and Land Use
Performance Measures
11. Project Prioritization and Selection Process: Final Report
12. Hampton Roads 2034 Long-Range Transportation Plan: Status Report
13. Hampton Roads Congestion Management Process (CMP): 2010 Update
14. VDOT Hurricane Evacuation Traffic Control Plan: HRTO Recommendation
15. Draft Hampton Roads Existing Land Use: 2009 Socioeconomic Base Year Update
16. Official Designation of TRAFFIX Oversight Subcommittee
17. Correspondence of Interest
18. For Your Information
19. Old/New Business
ADJOURNMENT
ENCLOSURES
2. Carolina Road Corridor Study
9. VDOT Review of Unobligated CMAQRSTP Funds
11A. Final HRTPO Program Priorities Methodology Report
11B. Final HRTPO Program Priorities Methodology Report Appendix
13. CMP Draft Report TTAC
14. Tech Analysis of Hurricane Evac Plan by HRTPO staff for HRTO
15. HRTPO 2009 Socioeconomic Base Year DRAFT Update
18D. SEHSR HRTPO comments
PRESENTATIONS
10. Regional Transportation and Land Use Performance Measures
11. CMAQ / RSTP Review Results
12. HRTPO Project Prioritization
13. 2034 Long-Range Transportation Plan: Status Report
14. Hampton Roads Congestion Management Process: 2010 Update
15. HRTO Review of VDOT’s Traffic Control Plan for Evacuation
HANDOUTS
3. Handout new agenda item ARRA
Hampton Roads Transportation Operations (HRTO)
Subcommittee Meeting
Tuesday, June 15, 2010
Agenda (Includes Minutes from April 20, 2010 meeting.)
PRESENTATIONS
VDOT Evacuation Plans
HANDOUTS
Letter to Harry Colestock
Transportation Technical Advisory Committee (TTAC)
Date: June 2, 2010
CALL TO ORDER
PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)
APPROVAL OF AGENDA
AGENDA (Full agenda packet, HERE; by section below)
1. Minutes of May 5, 2010
2. FY 2011 Unified Planning Work Program: Final Draft
3. Pruden Boulevard Corridor Study: Final Report
4. Regional Land Use Research Scan: Final Report
5. Draft FY 2011-2016 Six-Year Improvement Program
6. Hampton Roads 2030 LRTP and FY 2009-2012 TIP Air Quality Conformity
7. Requesting TIP Revisions and Transfers of CMAQ and RSTP Allocations
8. Public Participation Pilot Project: Outreach Via Elementary Schools
9. Carolina Road Corridor Study: Draft Report
10. TIGER II Discretionary Grants Program: Status Report
11. Regional Highway System for Which Cities Will Routinely Notify VDOT of Planned
Closures
12. For Your Information
13. Old/New Business
ADJOURNMENT
ENCLOSURES
2. FY 2011 Unified Planning Work Program: Final Draft
3a. Pruden Boulevard Corridor Study: Final Report
3b. Pruden Boulevard Corridor Study: Final Report Technical Appendices
4. Regional Land Use Research Scan: Final Report
6. Hampton Roads 2030 LRTP and FY 2009-2012 TIP Air Quality Conformity
10. TIGER II Discretionary Grants Program: Status Report
13f. Old/New Business- Preliminary National Rail Plan
PRESENTATIONS
5. Draft FY 2011-2016 Six-Year Improvement Program
6. Hampton Roads 2030 LRTP and FY 2009-2012 TIP Air Quality Conformity
8. Public Participation Pilot Project: Outreach Via Elementary Schools
9. Carolina Road Corridor Study: Draft Report
11. Regional Highway System for Which Cities Will Routinely Notify VDOT of Planned
Closures
HANDOUTS
12f. For Your Information - Federal Railroad Administration: Preliminary
National Rail Plan:
HRTPO STAFF TECHNICAL COMMENTS
12h. For Your Information - Public Comments
13. Old Business
2034 Long-Range Transportaion Plan Subcommittee
Date: Wednesday June 2, 2010
AGENDA
PRESENTATIONS & HANDOUTS
Transportation Technical Subcommittee
Date: Monday, May 24, 2010
CALL TO ORDER
PUBLIC COMMENT PERIOD (Limit: 3 minutes per individual)
APPROVAL OF AGENDA (Full agenda packet)
AGENDA
1. OVERVIEW OF TIGER II DISCRETIONARY GRANTS PROGRAM
HRTPO staff will provide a brief overview of the TIGER II grants program, including
the criteria by which the pre-applications and final applications will be evaluated by
USDOT. Attached is the Interim Notice of Funding Availability for the TIGER II program,
which includes project selection criteria and pre-application and application requirements, procedures, and deadline dates.
Attachment 1
.
2. REVIEW OF PROPOSALS FOR PRE-APPLICATION
FOR TIGER II
HRTPO staff will lead the group in a review of the projects proposed to be submitted
during the pre-application period for the TIGER II program.
3. OLD/NEW BUSINESS
ADJOURNMENT
Summary Minutes
Transportation Technical Advisory Committee (TTAC)
Date: May 5, 2010
CALL TO ORDER
PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)
APPROVAL OF AGENDA
AGENDA (to print full agenda packet, click here)
1. Minutes of April 7, 2010
2. FY 2009-2012 Transportation Improvement Program Amendment: Coordinated
Plan Projects
3. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds-Hampton
4. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds-Hampton
5. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds-Portsmouth
6. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate CMAQ Funds-Virginia Beach
7. FY 2009-2012 Transportation Improvement Program Revision: Request to
Reallocate RSTP Funds-WATA
8. CMAQ/RSTP Project Selection Process- FY 2011-2015: Report
9. HRTPO Project Prioritization and Selection Process: Economic Vitality
10. Transit Vision Plan Phase II: Status Report
11. Regional Land Use Research Scan: Draft Report
12. Pruden Boulevard Corridor Study: Draft Report
13. TIGER II Discretionary Grants Program
14. For Your Information
15. Old/New Business
ADJOURNMENT
ENCLOSURES
8. CMAQ/RSTP Project Selection Process- FY 2011-2015: Report
11. Regional Land Use Research Scan: Draft Report
HANDOUTS
9. HRTPO Project Prioritization and Selection Process: Economic Vitality
12. Pruden Boulevard Corridor Study: Draft Report
PRESENTATIONS
9. HRTPO Project Prioritization and Selection Process: Economic Vitality
10. Transit Vision Plan Phase II: Status Report
11. Regional Land Use Research Scan: Draft Report
12. Pruden Boulevard Corridor Study: Draft Report
Hampton Roads Transportation Operations (HRTO)
Subcommittee Meeting
Date: April 20, 2010
Time: 9:30-11:30am
Location: Sandy Bottom Nature Park, 1255 Big Bethel Rd, Hampton
Agenda (Includes Minutes from February 23, 2010)
Interagency Consultation Group Meeting
Date: April 7, 2010
AGENDA
Presentation
Transportation Technical Advisory Committee (TTAC)
Date: April 7, 2010
CALL TO ORDER
PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)
APPROVAL OF AGENDA
AGENDA (Full Agenda PDF)
1. Minutes of March 3, 2010
2. FY 2009-2012 Transportation Improvement Program Amendment: Virginia Beach
3. FY 2009-2012 Transportation Improvement Program Amendment: VDOT
4. FY 2009-2012 Transportation Improvement Program Amendment: HRTPO
5. Nansemond Parkway Corridor Study: Final Report
6. HUD Sustainability Grants Program
7. FY 2011 Unified Planning Work Program: Draft 2
8. Hampton Roads Passenger Rail Initiatives: DRPT
9. Identifying Potential Sources of Funding for the Norfolk LRT Project
10. 2034 Long-Range Transportation Plan: Review of Draft Candidate Projects
11. Waterborne Transit Concepts Study
12. Strategy for Re-Obligation of ARRA Funds
13. MOVES2010 Motor Vehicle Emissions Model
14. For Your Information
15. Old/New Business
ADJOURNMENT
ENCLOSURES
E5A. Nansemond Parkway Corridor Study: Final Report
E5B. Nansemond Parkway Corridor Study: Final Report -Technical Appendices
E7. FY 2011 Unified Planning Work Program: Draft 2
PRESENTATIONS
7. FY 2011 Unified Planning Work Program: Draft 2
8. Hampton Roads Passenger Rail Initiatives: DRPT
11. Waterborne Transit Concepts Study
12. Strategy for Re-Obligation of ARRA Funds
13. MOVES2010 Motor Vehicle Emissions Model
HANDOUTS
15. Norfolk TIP Amendment
2034 Long-Range Transportaion Plan Subcommittee
Date: April 7, 2010
AGENDA
Transportation Technical Advisory Committee (TTAC)
Date: March 3, 2010
CALL TO ORDER
PUBLIC COMMENT PERIOD (Limit 3 minutes per individual)
APPROVAL OF AGENDA
AGENDA (Full Agenda PDF)
1. Minutes of February 3, 2010
2. FY 2009-2012 Transportation Improvement Program Amendment: New CMAQ& RSTP Projects and Allocations
3. Regional Safety Study – General Crash Data and Trends Update: Final Report
4. Hampton Roads Congestion Management Process (CMP): Level of Service Results
5. VDOT Financial Estimates: 2034 Constrained Long-Range Transportation Plan
6. FY 2010 Unified Planning Work Program Amendments
7. FY 2011 Unified Planning Work Program: Draft 1
8. Nansemond Parkway Corridor Study: Draft Report
9. Proposed Air Quality Standards for Ozone
10. Hurricane Lane Reversal Plan
11. 2030 Long-Range Transportation Plan Amendments
12. For Your Information
13. Old/New Business
ADJOURNMENT
ENCLOSURES
E3. Hampton Roads Regional Safety Study: General Crash Data and Trends-2010 Update
E4. CMP Final Existing 2009 LOS with Maps
E8. Draft Nansemond Parkway Corridor Study
PRESENTATIONS
5. 2034 Long Range Transportation Plan Financial Estimates
7. Draft 1 - FY 2011 Unified Planning Work Program
8. Nansemond Parkway Corridor Study
9. Proposed Air Quality Standards for Ozone
10. Hurricane Lane Reversal Plan
11. 2030 Long Range Transportation Plan Amendments
HANDOUTS
6. FY 2010 Unified Planning Work Program:
Task 3.2 Amendment
7. Draft 1 - FY 2011 Unified Planning Work Program
11. Amendments to the 2030 Long-Range Transportation Plan for Hampton Roads
2034 Long Range Transportation Plan Subcommittee
Date: February 25, 2010
Agenda
Hampton Road Transportation Operations (HRTO) Subcommittee
Date: February 23, 2010
Agenda
Attachments
PRESENTATIONS
3. HRTO Designation & Composition
4. Communication Conduit - Norfolk
6. Regional Concept For Transportation
Operations (RCTO) Update
7. Move Over
Law
2034 Long Range Transportation Plan Subcommittee
Date: February 3, 2010
Agenda
TTAC February Meeting
Date: February 3, 2010
CALL TO ORDER PUBLIC
COMMENT PERIOD (Limit 3 minutes per individual)
APPROVAL OF AGENDA
AGENDA
1. Minutes of January 6, 2010
2. 2030 Long-Range Transportation Plan Amendment: Status Report
3. State Matching Funds for RSTP to be Tied to Regional Transportation and Land Use Performance Measures
4. Regional Safety Study – General Crash Data and Trends Update: Draft Report
5. Hampton Roads Congestion Management Process (CMP): Draft Level of Service Results
6. Designation and Composition of the Hampton Roads Transportation Operations Subcommittee
7. For Your Information
8. Old/New Business
ADJOURNMENT
ENCLOSURES
4.General Crash Data and Trends 2009 Draft Report
PRESENTATIONS
Agenda4-Crash_Data
Agenda5-CMP_Draft_Results
Agenda6-HRTO_Subcommittee
HANDOUTS
Handout_Agenda5-CMP_Draft_Results
Handout_Agenda7-ARRAstatus
Handout_Agenda7-NN_Rail_EIS_Review
Handout_Agenda7-Rail_EIS_Review
Transportation Technical Advisory Committee (TTAC)
January 6, 2010
Agenda and Attachments
Minutes (unofficial until approved)
ENCLOSURES
E.10 Coliseum Central Special Events Management Plan Study Report
PRESENTATIONS
6. Proposed Hampton Roads Fast Ferry System: MetroMarine Holdings, Inc.
8. Locally Administered ARRA Projects ‐ Milestone Deadlines and Risk Management:
VDOT
9. Urban Construction Initiative: VDOT
10. Coliseum Central Special Events Management Plan Study: Final Approval
HANDOUTS
3. Selected CMAQ/RSTP Projects
8. Hampton Roads Stimulus Projects-Status
Next Meeting
Previous Month's Meeting
Meeting Archives